Monitoring Construction

RULES OF CONSTRUCTION

  • A
    community liaison group must be prepared who have details of the works,
    the community communication plan, complaints management plan and are
    provided all reasonable requests for information
  • Prior
    to any work commencing, the community must be notified and given full
    details.
  • Construction
    hours are Mon to Fri, 7am to 6pm and Sat 8am to 1pm except for emergency
    or safety requirement
  • Operational
    noise should be within work hours and comply with the NSW Noise Policy
  • All
    heavy vehicles should enter via the temporary road. A secondary access
    route via City Road,
    Golden Grove, Wilson,
    Burren St can be used in exceptional circumstances (largely in initial
    construction).
  • Complaints
    should be responded to within 2 hours with a written response within 7
    days. Details are to be recorded in a complaints register.
  • Building
    condition surveys must be completed before jack hammering etc to all
    buildings within 50 metres from the edge. Damage is to be remediated.
  • Construction
    compliance reports must be provided to the director of planning after the
    first 6 months of planning detailing compliance.
  • The
    project must be carried out consistent with the Environmental Assessment

 

 COMMUNITY LIAISON
GROUP NOMINEES

A Community Liaison Group has been established to represent
residents concerns in the future.  TIDC
has not released names of Goup Members but known community representatives are
listed below – thank you for volunteering! 
First meeting is 30 May 2006.

You can contact the
lisison Group via Email at
no_stabling_yards@yahoo.com.au

  • Belinda
    Lucia (Railway Parade)
  • Gillian
    Mauchan (Burren St)
  • Trevor
    Ahearn (Sydney St)
  • Simon
    Lillis (Burren St)
  • Tim
    Hiley (Charles St)

Also thanks to the
following who expressed interest at the meeting in joining the CLG – subject to
TIDC acceptance.

  • John
    Collins (Charles St),
  • Peter
    Robinson (Henderson Rd)
  • Nadia
    Ballantine-Jones (Pine St)

 

MORE INFORMATION ON
THE PROJECT

The Review of Environmental Factors, Submissions Report and
Conditions of Approval and other information is available from the TIDC Macdonaldtown
Website at http://www.tidc.nsw.gov.au/ViewSite.aspx?PageID=470
 

 

CONTACTS ON
CONSTRUCTION ISSUES

TIDC 24 hour
Construction Response line: 1800 775 465

(Report everything through this line to make sure your
complaint is logged)
 

Other useful Numbers

TIDC general
project info 1800 684 490

Railcorp
Macdonaldtown Precinct Manager
Colin Coakley: 9224 4051 or 0438 606 169

Leighton Community
Relations Manager
Alice Pryke: 8198 5102 or 9414 3222

City of Sydney Council
traffic route compliance/law enforcement unit: 9288 5167 (note regos/time)

Department of
Environment and Conservation
: 131 555