Transport for NSW Public Documents on Transport Access Program

NSW Long Term Transport Master Plan

Details about the Master plan and sections of the report can
be downloaded from: http://engage.haveyoursay.nsw.gov.au/transportmasterplan

The full Master Plan is a very large document to download.
It can be downloaded from: www.transport.nsw.gov.au/sites/default/files/b2b/publications/nsw-transport-masterplan-final.pdf

REDWatch has made an extract from the Master Plan with key
references to Redfern Station and associated information. It can be downloaded
from: Redfern
& NSW Long Term Transport Master Plan

Transport for NSW Disability Action Plan 2012-2017

The Disability Action Plan 2012-17 was published in December
2012. It details the NSW Government’s Plan for addressing Disability issues on
public transport between 2012-2017. It shows the NSW has not met the 2012 targets
of the Federal Disability Discrimination Act 1992 and that it does not expect
to meet the 2017 targets. The report can be downloaded from: Transport for NSW Disability Action Plan 2012 – 2017