November 2009 Map Showing BEP2 study area (in red)

This is the map used for the Redfern Waterloo Built Environment Plan Stage 2 (BEP2) Update in November 2009. Note that the area shown is not the same as subsequently used by HNSW for their Master Plan area.

http://www.redwatch.org.au/RWA/statements/2009/091121doh/image