REDWatch Co-ordination Group Report for 2011-2012

REDWatch has had another hectic year, in large part due to HNSW undertaking its version of consultation on the Preliminary Master Plan (PMP) between September 2011 and March 2012 with REDWatch needing to make sure that the community had access to information about HNSW’s consultation. Throughout this process HNSW placed only their baseline study on… Read More…

REDWatch Co-ordination Group Report for 2012-2013

REDWatch Co-ord Report 2012-2013Following a hectic year of Housing NSW (HNSW) / Land and Housing Corporation (LAHC) “consultations” on the Preliminary Master Plan (PMP), 2012-13 was a quite year on the re-development front with HNSW/LAHC waiting for the release of the planning controls as part of the Built Environment Plan for the redevelopment of Redfern and… Read More…

REDWatch Co-ordination Group Report for 2010-2011

REDWatch Convenor’s Report 2010-11 Over the past 25 years, the digital revolution has changed the way we work and play almost beyond recognition. Increasingly, smart devices — portable tools that connect to the internet —have left many of us feeling bombarded with change from every direction, feeling stressed, overworked, confused, and with too little time… Read More…

REDWatch Co-ordination Group Report for 2021-2022

REDWatch had another year of strong action, capacity building and advocacy. Some the issues REDWatch has been active on since 1 July 2021 include: The Elizabeth Street / PCYC site moving from Build to Rent to Build to Sell The Council Rezoning of the Botany Road Corridor Waterloo South gateway, exhibition and determination  Waterloo South… Read More…