Kristina Keneally Submission on RWA Draft EE Plan
This is a copy of the submission from Kristina Keneally to the draft EE Plan – PDF 69KB Download: RWA_EE_Submission_KK.pdf »
Redfern, Eveleigh, Darlington, Waterloo Watch
UrbanGrowth NSW absorbed the Sydney Metropolitan Development Authority (SMDA) into UrbanGrowth NSW Development Corporation on 1 January 2013. The SMDA had itself absorbed the Redfern Waterloo Authorit
This is a copy of the submission from Kristina Keneally to the draft EE Plan – PDF 69KB Download: RWA_EE_Submission_KK.pdf »
This is Cliff Bott and Vimala Sarma’s Submission to the RWA BEP – PDF 14KB Download: Bott_RWA_BEP.pdf »
This is Bruce Lays of Darlinton’s Submission on the RWA BEP – PDF 31KB Download: Laybs_RWA_BEP.pdf »
This is Gai Smith’s Submission on the RWA BEP – PDF 56KB Download: Smithg_RWA_BEP.pdf »
This is the NSW Council for Social Services (NCOSS) submission to the RWA BEP – PDF 27 KB Download: NCOSS_RWA_BEP.pdf »
With the RWA Built Environment Plan’s proposal for six 18 storey buildings for the area around Redfern Station one community member thought that in line with truth in advertising (and logo’s) that the RWA now should revise its logo. The attached word file includes two suggestions which the author is happy to have in the… Read More…
This diagram is found in section 1 of the Draft Redfern-Waterloo Built Environment Plan (Stage One) February 2006 page 4. File is 14 KB PDF. Download: RWP.pdf »
This is diagram 2.2 from the Draft Redfern-Waterloo Built Environment Plan (Stage One) February 2006. The file is 147 KB PDF. Download: proximity.pdf »
This is diagram 2.1 from the Draft Redfern-Waterloo Built Environment Plan (Stage One) February 2006. The file is 144KB PDF. Download: Strategic Location.pdf »
This is a copy of the SEPP proposed to give effect to the Redfern-Waterloo Built Environment Plan. The SEPP itself is a 282 KB PDF. Please note that the related maps are about 1 MB each and links have also been provided below. Download: e06-030-42-d06.pdf »