Built Environment Plan Phase 1 – The State Significant Sites
Some sites within Redfern-Waterloo were declared areas of State Significant Development in 2005. In February 2006 the RWA released their draft Redfern Waterloo Built Environment Plan (BEP) in conjunct
Blacksmith Open Day at Eveleigh 2008 Video
This link is to a Youtube video from the Wrought Artworks openday. It covers extacts from a number of the speaches from the day and some footage of the day. The content covered is broader that the Blacksmith and covers the need for a heritage solution accross the entire site. http://au.youtube.com/watch?v=Zd4Rg7zkrxc
ATP’s Operating Blacksmith’s Shop Link
Material about the ATP’s Blacksmith Shop and the campaign to save it can be found on the REDWatch website from this link. http://www.redwatch.org.au/RWA/statesignificant/atp/blacksmith
Redfern residents kept in the dark over asbestos removal
More asbestos has been unearthed after construction began on the old Redfern Public school in Cope Street. Residents are concerned for their health as contamination levels exceed what was originally reported reports Patrick Billings in City News of 5th October 2008. Read More…
RWA North Eveleigh Concept Plan Preferred Project Report – Sept 2008
This is the RWA North Eveleigh Concept Plan Preferred Project Report (without Appendices). The full set of documents for the Preferred Project can be downloaded from www.planning.nsw.gov.au/asp/08_0015.asp . This document is 608 KB PDF. Download: 08_0015_nth_eveleigh_ppr_report.pdf »
RWA North Eveleigh Concept Plan Proposed Changes September 2008
The RWA has submitted to Department of Planning its responses to submissions received during the exhibition of their North Eveleigh Concept Plan in May and June 2008. The RWA’s has also submitted its modifications to the Concept Plan in their Preferred Project Report. This document and its appendice Read More…
National Indigenous Development Centre Site Remediation Works – Asbestos
Below is an update issued by the ILC on 27th August 2008 regarding the remediation works being undertaken for the National Indigenous Development Centre. Read More…