Paint Shop Precinct – what the LEP maps tell us

When looking at a planning proposal like North Eveleigh, it is useful to start at the proposed planning controls. This is the place the developer starts in working out what they can do within the rules or where bending them might be possible and hence what they might pay for the site. Below REDWatch Read More…

A Quick REDWatch Guide to the North Eveleigh Consultation

This is REDWatch’s Guide to the Exhibition consultation and and the documents. It is based on our email to our distribution lists and includes an additional section at the end matching up the proposal’s studies to the Appendix of the main Planning Report. Read More…

Eveleigh Link Bridge – North Eveleigh Bates Smart Page 324

In the Urban Design Study there is the single page assessment of a pedestrian link bridge between North and South Eveleigh. The last sentence below says: (Detailed consideration is outside the project scope and does not have NSW Government funding). Interestingly in the Large Erecting Shop (LES) rezoning by TAHE / TfNSW / Mirvac where… Read More…

Artist Impression of Paint Shop Precinct from Video Fly Through

This Image shows what might be possible under the proposed rezoning between the Paint Shop and Redfern Station. This is a planning proposal so the images are indicative of what might be possible under the planning proposal being publicly exhibited.

Outline of the Paint Shop Precinct Masterplan

This outline can be found in the Transport for NSW newsletter. It gives an overview of what is being proposed for the site under the masterplan reflected in the rezoning planning proposal on exhibition until 25 August 2022.

Minister’s media release on Redfern North Eveleigh Paint Shop Precinct Rezoning until 25 August

This is the text of Minister Stoke’s media release regarding the rezoning of the Paint Shop Precinct of Redfern North Eveleigh of 26 July 2022. Links to related sites about the site and the exhibition have been added to the foot of this post. Read More…

REDWatch comments on LES use by Mirvac

Mirvac held two two information sessions on the future of the Large Erecting Shop (LES) on 31 May and 1 June 2022 about their pre-planning for the redevelopment of the South Eveleigh Large Erecting Shop. Below is the background to this development prepared by REDWatch. Read More…