BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//REDWatch//Events//EN
CALSCALE:GREGORIAN
BEGIN:VEVENT
UID:rw-event-5772@dev.redwatch.org.au
DTSTAMP:20261128T070324Z
DTSTART:20200604T180000
DTEND:20200604T193000
SUMMARY:REDWatch Zoom Meeting &#8211\; June 4th 6pm – A Tale of Two Stati
 ons
LOCATION:On Line using Zoom
DESCRIPTION:Transport for NSW (TfNSW) will present its Redfern Station prop
 osal to the June REDWatch meeting which will be held at 6pm on 4th June on
  line via Zoom. REDWatch has also asked TfNSW to provide an update on what
  is happening for other aspects of the Redfern Station redevelopment. You 
 can see more about the plans for Redfern Southern Concourse at - REDWatch 
 Update on Redfern Station Southern Concourse Exhibition until 24th June 20
 20 Also at the REDWatch meeting we will be joined by representatives of th
 e John Holland/Mirvac joint venture responsible for the Waterloo Integrate
 d Station Development\, which includes both the Metro station and the over
  station development. While they are not ready to start their consultation
  at the REDWatch meeting they can talk about what they are doing\, clarify
  any planning questions\, and take on board any comments about the develop
 ment. A joint venture between John Holland and Mirvac is in the process of
  preparing building and public space designs for the Waterloo Integrated S
 tation Development which includes the new Waterloo Metro Station and the o
 ver station development. They won the rights to the development against ot
 her developers on the short list. In last year’s planning process\, the 
 land occupied by the future station site\, was rezoned to allow the develo
 pment of the site. The rezoning approval made some changes to what was exh
 ibited. While the approval kept a similar amount of floor space for commun
 ity uses it removed the dedicated “community building” creating a larg
 er community square. The approval also allowed for the possibility of a gr
 eater quantity of office space and allowed the movement of some floor spac
 e between the towers and the buildings to the east of the towers next to t
 he station boxes. The approval sets the parameters within which the joint 
 venture is developing the proposed building and public space designs. The 
 John Holland Mirvac joint venture will start pre-lodgement community consu
 ltation in June. The community is keen to see what the joint venture is pr
 oposing and to provide comments. If you would like to join this online RED
 Watch meeting via PC or phone please email mail@redwatch.org.au for link a
 nd login details. REDWatch members and supporters will find the link in th
 eir latest email update.    
URL:https://dev.redwatch.org.au/events/200604redw/
ORGANIZER;CN="Geoff Turnbull":mailto:mail%40redwatch.org.au
END:VEVENT
END:VCALENDAR
