Waterloo Safety Audit report 2012
his is a copy of the 2012 Waterloo Safety Audit report is released, conducted by Waterloo Neighbourhood Advisory Board lead by City of Sydney Council Download: Waterloo Safety Audit – December 2012.pdf »
Redfern, Eveleigh, Darlington, Waterloo Watch
his is a copy of the 2012 Waterloo Safety Audit report is released, conducted by Waterloo Neighbourhood Advisory Board lead by City of Sydney Council Download: Waterloo Safety Audit – December 2012.pdf »
The Planning Assessment Commission (PAC) handed down its determination on the University of Sydney’s Abercrombie Street Business School on 16 November 2012. The PAC made a number of changes to the Departments proposed conditions. The PAC conditions cover the entrance moving from Abercrombie Street and the conditions for the University is to prepare a Darlington… Read More…
The Planning Assessment Commission (PAC) handed down its determination on the University of Sydney’s Abercrombie Street Business School on 16 November 2012. The PAC made a number of changes to the Departments proposed conditions. The PAC has determined that the entrance to the Development is not to be from Abercrombie Street and that the University… Read More…
The SMDA have posted their response to community submissions and anounced they will start work on the infrastructure required for the North Eveleigh Affordable Housing project. The announcement issued an email statement and placed details on their website on 13 November 2012. The details from their Read More…
Following approaches from REDWatch about the non release of the HAF funded Preliminary Master Plan and the associated HNSW/DFS performance reports Tanya Plibersek made the attached representation to Brendan O’Connor MP the Federal Minister for Housing and Homelessness. On 28 September REDWatch was advised by DFS that “Our colleagues at the Commonwealth, Managing the HAF… Read More…
This is an extract from the HAF – HNSW Redfern Waterloo Preliminary Master Plan Agreement signed on 27 October 2010. It sets out what it was agreed to be funded and how it was to be reported. We have included only the key aspects of the report here so they can be compared with the… Read More…
The forth Report to HAF was done by DFS and reports on: the Preliminary Master Plan community consultation, the Preliminary Master Plan and the Infrastructure Strategies Initial Stage. The Forth report notes that the “preliminary master plan and Infrastructure Strategy Initial Stage Reports will require review once proposed planning controls are finalised by the Sydney… Read More…
The third Report to HAF was done by DFS and reports on: Preliminary Background Studies (Physical Services Infrastructure, Flooding and Drainage, Social and Demographic Analysis, Land Use Review, Redfern and Waterloo Tower Conversion Scoping Study, Urban Tree Assessment and Informal Market Sounding and Property Advice); Concept Staging Options (Physical Services Infrastructure, Social Services Infrastructure; Physical… Read More…
The second Report to HAF by HNSW reports on the Concept Plan Vision and the Concept Plan Staging Options. The file is 69KB PDF. Download: Redfern Waterloo – report 2 – final.pdf »
The first Report to HAF by HNSW reports on the Desktop survey database, the Community building and engagement framework and the Preliminary community consultation. The file is 56KB PDF. Download: Redfern Waterloo – report 1 – final (2).pdf »