Mayoral Minute 28 August 2006 City of Sydney

To Council:

On 26 June 2006, I provided to Council a Lord Mayoral Minute
concerning the Minister for Planning decision to declare the Carlton &
United Breweries (CUB) site a major project under Part 3A of the Environment
Planning & Assessment Act (Attachment
A)
.

Since then:

  • The
    City has sought legal advice as to whether the Order made by the Minister
    on 23 June 2006 was valid. This is discussed below.
  • On
    21 July 2006, the Minister revoked the earlier Order and made a new Order
    in the same terms, except that a map was attached (Attachment B).
  • On
    15 August 2006, the expert panel advising the Minister held a public
    meeting.  This is also discussed
    below.
  • The
    Department of Planning has also published on its website a letter to the
    Minister dated 5 July 2006 from JBA Planning (acting for the site owner)
    and a ‘Scoping Paper’ (Attachment
    C)
    . The Paper’s attachments are not on the website.
  • The
    Minister for Planning has provided no substantive response to the letters
    I sent him in accordance with the CSPC Resolution of 22 June 2006 and the
    Council Resolution on 26 June 2006. The Minister’s letters and my further
    response are at Attachment D.

Public Meeting –
Scoping Paper

A CUB meeting on 15 August was organised by the “expert
advisory panel” established by the Minister after he took over planning control
for the site on 21 June. The City was not formally invited to the meeting.

The public meeting was advised that Fosters, the site owner,
had prepared a “Scoping Paper” as the basis for redevelopment and new planning
controls on the site. The meeting was also told that Fosters would submit a
Concept Plan, which the Department would assess—although there were no publicly
available criteria for that assessment.

However, meeting participants report that important material
was only presented briefly on screen and the proposal presented by the Panel’s
Chair, Chris Johnson of the Department of Planning, was based on material from
Fosters. The important Scoping Paper was not presented to the meeting and
requests to discuss it were refused.

Summary of Foster’s
development proposal

There are many issues needing clarification in the proposal
presented to the public meeting and described in the Scoping Paper.

Floor space

The Scoping Paper proposes 260,000 square metres of floor
space (a density of around 4.5:1), comprising 1800 apartments, 97,000 square
metres of commercial space and 12,000 square of retail space. As a comparison,
this floor space is 80 per cent of the amount proposed for East Darling
Harbour, which has a site
area four times larger.

By comparison, based on expert advice and extensive
consultation, the City and Central Sydney Planning Committee (CSPC) determined
that a floor space ratio of 4:1 was at the absolute maximum end of acceptable
density, contingent on public benefits and design excellence. The draft
planning controls adopted for public exhibition by the CSPC and Council set
floor space ratio in the range of 3.5:1 to 4.0:1.

Height

The proposal presented at the public meeting indicated that
building heights up to 110 metres were being considered, which is more than
three storeys (10%) higher than permissible under the City’s draft LEP for the
site. Other towers proposed on the site are also taller than allowed under the
draft LEP.

Heritage

The proposal shown at the meeting on 15 August proposes
demolition of up to five buildings with heritage significance, destroying the
distinctive heritage precinct proposed by Council and the Central Sydney
Planing Committee (CSPC) to give the redevelopment real interest and character,
consistent with the social and industrial significance of the site.

Open Space

The Scoping Paper proposes a single parcel of park area of
5,000 square metres maximum.  The
proposed park appears to incorporate land owned by the City of Sydney without the City’s agreement.

Diagrams presented to the public meeting showed no
protection for morning sun for the park, which was an important element of the
draft planning controls endorsed by Council and the CSPC.

Car parking on site

The Scoping Paper does not state what density of car parking
is proposed on the site.  However, it
includes “retention of some 250 existing car spaces” which appears to be based
on an existing public car park operating on the site, which is not an approved
use.

Voluntary Planning Agreement

The letter implies that negotiations in respect of the
Voluntary Planning Agreement (VPA) are still underway.  The basis for the City proposing to enter
into a VPA was that the City’s draft planning controls would be made and
followed. 

That basis for a VPA no longer exists and, since the
Minister has taken over planning control at the site, the City has had no
discussions with Fosters about a VPA.

The Scoping Paper also proposes ultimate dedication to the
City of streets, laneways and shared zones. 
While included in the previous draft VPA, the City has not been
consulted or informed about this current proposal.

Planning certainty

The letter refers to a “necessary level of flexibility for
the more detailed design phase of the project”. It is not clear what is
intended, but this raises concern that there could be a further increase in
actual FSR after approval of a design concept.

City ‘section 61’ development levy

Clause 8.3 in the Scoping Paper states that Section 61 still
applies in relation to development contributions, but it inaccurately states
that the “nature and extent of development contributions were matters that were
being discussed with the City of Sydney”. 
The development contribution is 1% of the development cost, and is set
under the City of Sydney Act.

Legal Advice

The City has obtained preliminary legal advice on the
validity of the Minister’s order.  A copy
will be circulated on a confidential basis to Councillors.

The advice is preliminary at this stage as there is a
limited amount of information available publicly to enable a proper review of
whether the Minister’s actions are within power.  The preliminary findings of the legal advice
can be summarised as follows:

1.                  
The original Order dated 23 June 2006 appeared
to be invalid as it did not identify the land to which it applies.  This has been rectified by the further Order
made on 21 July 2006 with a map attached.

2.                  
An Order under Part 3A must relate to a project,
not a site.  At the time the Orders were
made, there is doubt that a project had been identified with sufficient
certainty for the Order to be valid.

3.                  
An order must be made for proper reasons in
order to be valid.  To date the only reasons
available are set out in the Minister’s press release on 21 June.  These do not appear to be proper reasons for
the project to be determined as a major project under Part 3A.

4.                  
The Minister has apparently appointed an expert
advisory panel.  The membership of this
panel is not consistent with the relevant legislative provisions as it includes
an employee of the Department of Planning. 
In addition, the role of the expert advisory panel is unclear as no
documents, other than a press release, have been made available on this issue.

5.                  
Without further relevant documents, if they
exist, it is difficult to have any certainty about the prospects of challenging
the Minister’s order.

6.                  
Ultimately, as has already occurred, the
Minister can keep making fresh orders until they are sufficiently clear and
valid so as to overcome being challenged. 
However, this is hardly a satisfactory process.

7.                  
In relation to the expert advisory panel, it
appears they have been appointed prematurely and may be invalidly constituted.  A fresh panel could be constituted validly by
the Minister.

For all the above reasons, the hasty “calling in” by the
Minister has been and will continue to be problematic and has led to greater
uncertainty about the future of the site and the timeframe for the development.

Transparency and accountability continue to be a major
concern. The CSPC’s and City’s complex and balanced redevelopment proposal,
worked out through extensive planning studies, numerous public forums and
negotiations with the site owner, could be compromised.

While the public may be provided with an opportunity to
comment on the site owner’s proposal, there is no publicly established process,
no established criteria for assessing the proposal, no further public forums,
the Minister is not required to take public concerns into account, and there is
no recourse for appeal.

Recommendation

That Council work with the local Chippendale community to
gain public commitment from the Minister for Planning to:

(A)        Full
consideration of the findings of the Central Sydney Planning Committee’s and
Council on the CUB site, including the extensive research, heritage studies,
public consultation and draft planning controls;

(B)        a clear
process and timeframe, including public consultation, for assessing Fosters’
proposal to redevelop the CUB site; and

(C)        a further
public meeting to ensure comprehensive and informed public debate on issues
unresolved or unaddressed at the public meeting on 15 August 2006.

 

Attachments

Attachment A    Lord
Mayoral Minute from 26 June 2006 and Resolution of Council

Attachment B    Order
dated 21 July 2006 (including attached map)

Attachment C    Letter
from JBA Planning to the Minister for Planning dated 5 July 2006 and ‘Scoping
Paper’

Attachment D    Letter
of 3 July 2006 from the Minister for Planning; letter of 12 July 2006 from the
Minister; and letter to the Minister of 19 July 2006.

 

Documents referred to can be found on the
Council website at:

 

3.1
Carlton & United Breweries Site Chippendale – Update | PDF 57Kb

Attachment A | PDF 1.7Mb

Attachment B | PDF 513Kb

Attachment C | PDF 4.5Mb

Attachment D | PDF 883Kb