As part of the NSW Government’s Rail Clearways Program, the Transport Infrastructure Development Corporation (TIDC) is proposing to construct a train stabling facility for eight trains at Macdonaldtown. While this is within the RWA State Significant Area it predates the current RWA development approval proceedures and is not being handled by the RWA. It has been included here as it is a development within the RWA State Significant boundary being undertaken by Government which has attracted significant community concern.

In this section

  • Letter from City of Sydney Regarding Truck Movements
    22 December 2005 Martin HallidayDirector, Planning and EnvironmentTransport Infrastructure Development CorporationLocked Bg 6501ST LEONARDS  NSW  2065 Dear Mr Halliday I refer to your letter concerning access to the MacDonaldtown Stabling...
  • Letter Regarding removal of trees without permission
    The following letter was written by Macdonaldtown Residents Group in protest at TIDC / Leightons claiming to have approval to remopve mature trees and then removing the trees near Macdonaldtown station without approval.
  • MacDonaldtown Stabling Yard Leaflet
    As part of the NSW Government's Rail Clearways Program, the Transport Infrastructure Development Corporation (TIDC) is proposing to construct a train stabling facility for eight trains at Macdonaldtown. This brochure provides an overview of the Macdonaldtown Stabling Project, outlines the main envir
  • Macdonaldtown Stabling Yards Update - 18.02.2006
    This is a February 2006 update. Following the TIDC consultation TIDC has appointed a precinct manager responsible for the project.
  • Monitoring Construction
    It is important for residents to now monitor compliance with the Rules of Construction and report any breaches to TIDC’s 24 hour Construction Response line 1800 775 465.
  • No Stabling Yards Macdonaldtown Residents Group - 15.12.2005
    A Residents Action Group calling itself No Stabling Yards Macdonaldtown has formed out of concern about the project. The following information was extractred from a leaflet circulated through the area to encourage submissions to the community consultation. The consultation was originally to end on 2
  • Stabling Yards Update - 24.02.2006