Redfern Waterloo Issues Discussed with Minister Keneally

ISSUES FOR DISCUSSION WITH MINISTER
KENEALLY

Tuesday 14th October 2008

 Background – Redfern Waterloo Issues Updates 1200 emails
& website

  • Geoff
    • RWA
      BEMAC
    • REDWatch
      Spokesperson
    • REDWatch
      Website (Sept per day 400 visits / 1500pages / 8000hits)
    • Media
      & Website Monitoring on REDW
    • Briefing
      of journalists, organisations, Tour of Beauty etc
    • RWCC
    • Pemulwuy
      Project Committee
  • Lyn
    • RRR
    • Sydney University Settlement
      Neighbourhood Centre
    • REDWatch
      coming events

 Liaise with a wide range of people about Redfern Waterloo
Issues and get information passed on to us for RWIU and REDWatch website.

What I would like to see:

A better flow of information & less need to read tealeaves

  • Media
    Releases from Minister re REDW matters
  • An
    improved DoP website (easy for users / community to monitor)
    • Items
      added to site in timely manner
      • when
        a site is called in and
      • when
        new docs received
      • when
        approvals are announced by the Minister
    • Changes
      to the website so it is easier for people to provide link to a project
      and to monitor a project eg a web page for each project within the
      register
  • Greater
    release of information to the community and not just what can be written
    up in a media release or the RWA Update newsletter e.g.
    • BEP1
      traffic Study only made available in NE discussions
    • RWA
      Update July article on HSP1 Evaluation but still Plan not released
    • Details
      publically available studies etc.
  • RWA
    / Ministerial engagement in discussions about the redevelopment putting
    the RWA’s position (I have participated in a number of forums held by
    professional bodies or academics where the RWA have declined to
    participate. The RWA have declined to participate in Tours of Beauty)

Greater Community Involvement by Minister / RWA

Revisit the Community Engagement put in place by Minister
Sartor

  • Ministerial Advisory Committees need to be
    rethought
    • They
      currently advise no one – selected community reps get a report from the RWA
      about what they have been doing in the last 3 months with an occasional input
      from a representative of a Govt Dept representative (who is involved in SOG or
      other parts of the process). There is no reason why this level of information
      should be made at a closed forum – any one interested should be able to attend
      if this is all it is going to do.
    • Minutes
      of the existing MAC’s should be made publically available. Currently for
      example we have no access to information on what is happening on the employment
      taskforce as we do not have contact with one of the appointees to this
      committee.
    • If
      MAC’s are to perform an advisory role then they need to be involved in the
      process before decisions are made. They need to be more representative. The MAC
      for example saw none of the design competition material for NE and was briefed
      on the NE Concept plan a few weeks after it was on exhibition.
    • One
      of the key issues for the area is what happens re Redfern Station but the BEMAC
      is not allowed information on this.
    • The
      HSMAC was told sometime ago that the Minister was advised through the Minutes
      of the Meeting. Helen Campbell from
      RLS said at the time that with the minutes not recording what she was saying
      then the Minister was not getting her advice.
  • Public meetings
    • Minister
      Sartor proposed four a year but nothing eventuated the Newsletter at the time
      said “A Community Forum to meet at least four times a year will be open for
      members of the public to attend. The purpose of this Forum is to provide the
      Minister with advice on the broad strategic direction of the Redfern-Waterloo
      Plan and provides the community with a direct link to the Minister
      ”.
    • A
      Community Forum similar to that held previously by the RWPP and the CoS could provide a report back function as well as a
      mechanism for community input. The RWPP forums were well attended
  • Revisit the old RWPP Community Council
    • If
      a smaller representative group is required to provide a more sensitive sounding
      board on issues then the structure of the old RWPP Community Council should be
      considered.
  • Meetings with Stakeholders
    • There
      should also be opportunities for meetings to be held with stakeholders about
      the issues of the moment. These should not just be confined to the “statutory”
      exhibition times. Currently for eg meetings would be appropriate for:
      • Those around the NE site regarding the RWA
        Preferred Plan
      • Those with a heritage interest re the Heritage
        Interpretation Strategy

Formulation of an Exit Strategy with long term benefits

The RWA comes up for review at the end of 2009. The RWA’s
active involvement in Human Services has ended and much of the BE planning
agenda will be finalised in the next 18 months. There have been recent calls
for the RWA to be disbanded. What is the Govt’s exit strategy to ensure long
term benefits?

  • Human
    Services – the starting point.
    • With
      the end of the RWPP funding for the RWA and the formulation of the HS
      Plans more responsibility moves to the SOG. When the RWA exits what will
      be the mechanism for interaction with the areas residents and non
      government service providers. This needs to be built now.
    • For
      the first time, as far as I am aware, the SOG has invited residents to a
      SOG meeting to discuss the Waterloo Green and resident concerns on Human
      Services.
    • What
      will Govt do to ensure that the increased RW population mix harmoniously
      with the increasingly high needs public housing tenants?  This is a question to date no one seems
      to want to discuss.
    • At
      the RWA HS forum to present HSP2 and talk about the evaluation of HSP1
      there were many questions raised by non-government agencies and residents
      about what was presented. Some of this may become clearer when HSP1
      evaluation is released.
    • The
      RWA processes differed from that envisaged in the Morgan Disney Report
      and the processes of the RWPP. From the perspective of many NGO’s there
      remains a significant gap between Govt and Non Government agencies on the
      areas human services issues which for the long term benefit of the area
      needs to be addressed by Government through the SOG with hopefully the
      encouragement of the Minister for Redfern Waterloo.
  • Built
    Environment – what needs to still happen before this can be dealt with by
    Council as envisaged initially by the RWPP under the RED Strategy.
    • BEP
      and BEP2 will provide planning frameworks
    • Council
      can handle under $5m as they do elsewhere
    • DoP
      handle over $5m under part 3A 

Some Specific Issues that Need to be Addressed

  • An
    upgraded Redfern Station that works in terms of connectivity (at least
    this aspect should be made public). It should not turn its back on the
    Block.
  • A
    Movement Economics Study across the area to look at how it will interact
    as a whole to build business and activity
  • A
    long term Plan to address the barriers provided by the Reagent &
    Gibbons Arterial pair including their eventual return to two way traffic.
    This is a long term objective of the Redfern Waterloo Chamber of Commerce
  • A
    long term plan to address the barrier created by the main railway line. At
    some point there has to be at least one more connection between North and South Eveleigh. In the rail days there were three.
  • RED Square –
    the proposal to cut the edge off the top of Eveleigh street and open the Block
    up rather than having antisocial activity hiding behind the brick wall was
    in the RWPP proposal. The RWA and Railcorp should be encouraged to revisit
    the proposal.
  • There
    has to be movement on redevelopment of the Block. Housing NSW should enter
    discussions with the AHC and AMS about the use of their three vacant
    terrace housing blocks in the middle of the proposed Pemulwuy project.
  • There
    needs to be a heritage strategy developed right across the former railway
    site in much more detail than the NE HIS. This should be done in consultation
    with those involved in heritage work in the area.
  • There
    should be a long term plan for the Large Erecting Shop
    to be used as a functioning rail heritage as proposed by Friends of
    Eveleigh within the Eveleigh rail yards heritage precinct as part of the
    HIS.
  • There
    should be serious discussions between Sydney University and the NSW
    Government about their interest in the NE site with a view to seeing if an
    accommodation can be reached that would see the University not acquire
    development capacity they say they do not need (and be held to it!). The
    State Government should pick up any shortfall in the upgrade of Redfern
    Station as they would do if there was not nearby land to offset the cost.
    The University development is seen by many as having less impacts on the
    area than the current higher density proposal.
  • On
    the North Eveleigh site there is concern
    about the density and that the RWA Concept Plan has not locked in aspects
    at the concept plan stage (eg Heritage Interpretation Strategy) and that
    when the site is broken up it will be difficult to have a consistent
    outcome.
  • The
    problems with the western exit of the North Eveleigh
    site were raised with Minister Sartor at his familiarisation walk around
    and there is ongoing concern that the modification does not adequately address
    the issue.

More Detailed Discussion of Issues

REDWatch prepared “An
Agenda for Redfern Waterloo Changes in 2007 – State Election Issues
”
much of what is in this document in terms of the issues needing to be addressed
remains relevant and should be addressed.

Notes for Meeting Prepared by:

Geoff Turnbull