Leaked cabinet documents in 2004 foreshadowed the NSW Government’s
interest in redeveloping the area’s public housing estates. In 2006 the RWA
announced that planning for this would be done as part of its Built Environment
Plan 2 (BEP2). In the same year Sydney Council developed and exhibited its own
draft planning controls, now awaiting exhibition as part of Council’s new Local
Environment Plan (LEP). Meanwhile the RWA awaits cabinet approval of its rival
BEP2 which will then be shown to the RWA’s Ministerial Advisory Committee and
exhibited for public comment. On a third front, the land owner, Housing NSW
(HNSW), has obtained Federal funding to develop its own Preliminary Master Plan
by mid 2012 for the housing estates and adjoining area. HNSW is waiting for BEP2
to be exhibited before proceeding.
A Council report about the LEP said: “After additional
consultation with Housing NSW it has been clarified and accepted that Waterloo
Redfern Urban Design Study has offered reasonable and appropriate LEP
recommendations. Redfern Waterloo Authority Built Environment Plan – Stage 2,
as advised by the Authority, will not be dissimilar to Council’s
recommendations and strategy for this area.” If this is so then why do we need
the BEP2 to propose alternative controls and why do we need both the BEP2 and
the HNSW Master Plan to provide the finer grain for the plan? It is not plain
what is wrong with Council’s LEP or why three different overlapping plans are
necessary.
What is clear is that the NSW Government wants to redevelop
the Redfern Waterloo housing estates. The model being considered is to decrease
the concentration of public housing residents in the area by significantly
increasing the number of private residents living in the area. The proposed
increase is not yet public but based on the 2004 cabinet papers and HNSW’s
usual mix, it is expected that there will be about two new residents in the
estate area for every existing public tenant.
Central to the shape of the redevelopment is which buildings
get redeveloped. Around half of the area’s public tenants live in the high rises.
HNSW considers the high rises will not need replacing for quite some time. The
question here is what work can be done to improve these buildings. Will they
remain just for public tenants, or will some buildings become all private
housing or possibly mixes of public and private tenants?
If the high rises remain, the main redevelopment will be
focussed on the low rise walk-ups where the other half of public tenants live
and where any increase in population would need to be housed. The REDWatch
paper outlines a worst case scenario in which the high rises all stay public
housing and the government redevelops the walk ups resulting in four out of
five of the new homes going to the private market. The cash strapped NSW
Government receives a windfall profit, a statistical dilution of the social
problems, and is able to shelve the challenge of dealing with half the public
housing stock for a future government.
But the issue is not just about renewing buildings. It is
also about what Government terms “social mix”. The gentrification of
surrounding private properties has coincided with Government changes to
eligibility for public housing resulting in estates with concentrated
disadvantage in what is becoming housing of last resort. The area has become
more polarised. Governments want to break up the concentration they have created
and spread the problems more evenly through the community. The “social mix”
argument is that it is better for the disadvantaged to mix with the “better
off”, but the research on the subject is not clearcut. A downside is that it
may lead to less access to services and greater social isolation as the
opportunity to mix does not address the issues that are increasingly the
prerequisite to gain entry into public housing.
Complex multiple needs require integrated human service
delivery and as people with higher needs have been concentrated in public
housing the required human services and the integration between them has lagged.
Tenants regularly complain about disruptive tenants and want them removed.
Often the disruption stems from inadequately addressed psychiatric, drug and
alcohol or other issues of the disruptive tenant.
REDWatch has argued strongly for many years that without
significant improvement in integrated human service delivery there may be increased,
not decreased, tensions post redevelopment. Private residents living in closer
proximity to public tenants with multiple needs are unlikely to tolerate
behaviour that HNSW currently expects its public tenants to tolerate. Improving
human service delivery has to be a central element in addressing the future of
public housing in the area.
Service delivery also has to cover how the housing and
tenancies will be managed. HNSW currently has a policy of divesting its
property to non-government housing providers, and this is likely in Redfern and
Waterloo as part of the redevelopment. While there are issues with this
divestment, the problem of management is not just about managing the buildings;
it is most importantly about the people that live there. Do they feel safe in
their building? If they report a problem will it be addressed? HNSW is spending
a lot of money on a trial of a concierge program in Waterloo and such improved ways
of managing property and high needs tenants need to be part of the redevelopment
irrespective of the underlying property ownership.
The Government is saying all these problems are on the table
and need to be addressed in its redevelopment plans. Tenants, however, argue
that most of these problems already exist and question why they should believe they
will be addressed as part of the redevelopment given the Government’s present
inaction on the issues.
To address any of these problems requires money! Money to
pay for proper human service support and accommodation for high needs tenants, money
for property maintenance, money to make social mix more than a statistical
dilution and money to properly manage the tenancies and the buildings. These
are ongoing government costs for properly running high needs public housing. On
top of this there is also the money needed to rebuild the community after the
social dislocation from the redevelopment.
The proposed redevelopment of Redfern and Waterloo public
housing dwarfs HNSW often mentioned Minto and Bonnyrigg projects. BEP2 and HNSW’s
Master Plan will have to deal with inner-city issues like open space, affordable
housing and community facilities. It also needs to find solutions to problems
stemming from years of underfunding of public housing and human services if the
promise of a brighter future for the public tenants of the future and their
neighbours is to be delivered. SSH
More information can be found at www.redwatch.org.au/issues/public-housing
Source: South Sydney Herald December 2010 – www.southsydneyherald.com.au/pdf/SSHDEC10.pdf