Progress Report on Redfern Station – 23 Nov 2016

The extract below is taken from the minutes of a meeting Wednesday, 23 November 2016 between representatives of Transport for New South Wales and representatives of the Planning Assessment Commission as part of its assessment of the Australian Technology Park State Significant Development Applicatio Read More…

Lift to be built for Redfern Station

Minister for Transport Gladys Berejiklian today announced a lift would be built to Redfern Station platforms 6 and 7, making the station accessible to customers in wheelchairs and parents with prams for the first time reports this media release of by Minister for Transport Gladys Berejiklian on 31st Read More…

Options for Redfern station upgrade

The South Sydney Herald has also obtained the documents released by RailCorp to Lift Redfern regarding “information relating to planned upgrades at Redfern Train Station”. The documents show the various plans for redevelopment, from the mid 2000s until about 2010, including one favoured by RailCorp Read More…

Redfern Station Revised Concept Design Report Section C Cost and Constructability 2009

This is Part C Cost and Constructability of the Redfern Station Revised Concept Design report Section B Engineering Reports undertaken by Bovis Lend Lease. This part of the report is a scan of the Bovis Lend Lease report and deals with Construction Methodology and Program, Station upgrade and development costs and associated Appendices. Financial figures … Read more

Redfern Station Revised Concept Design Report Section A Architectural Design 2009

This is Part A of the Redfern Station Revised Concept Design report Section A Architectural Design undertaken by Cox. This part of the report deals with 01 Introduction, 02 Scope of Work, 03 Background, 03.1 The existing station and need for redevelopment, 03.2 Integration with other development projects in the area, 03.3 Summary of previous … Read more

Redfern Station Upgrade Concept Design Study Part B – Engineering Reports 2007

This is Part B of the Concept Design Study for the Redfern Station Upgrade of April 2007 undertaken by Connell Wagner. It deals with 1. Preliminary Service Recommendations 2. Requirements for vertical circulation under peak AM loads 3. Pedestrian Evacuation and Fire engineering report 4. STEPS Pedestrian Simulation Modelling results 5. Structural Design Report 6. … Read more

REDWatchMake a DonationEventsmail@redwatch.org.au