Heritage Significance of Paint Shop Precinct Buildings

This is a 14 page extract from the Paint Shop Precinct Heritage Interpretation Strategy detailing the significance of each of the buildings and places impacted by the proposed Redfern North Eveleigh Paint Shop Precinct master plan. While many buildings are not greatly impacted by the proposal, The Paint Shop (c1888) and the Paint Shop Extension … Read more

The Proposed Paint Shop Precinct Heritage Map

The Proposed Paint Shop Precinct Heritage Map

This is the same as the existing map. When compared to the height map it shows that all heritage buildings except the Paint Shop are to stay at existing heights and are protected. The proposal for the paint shop shows that an up to 63.6 m building can be placed anywhere above the paint shop, … Read more

The Proposed Paint Shop Precinct Height of Buildings Map

The Proposed Paint Shop Precinct Height of Buildings Map

This is the map that defines the possible building envelopes and the area within which the maximum heights might be used. The reference scheme used in the graphics is just one of many possible options possible under the controls. The developers can move that height anywhere within the height controls. How much floor space is … Read more

The Paint Shop Precinct Proposed Land Use Map

The Paint Shop Precinct Proposed Land Use Map

Probably because of the decision to place FSR across the entire site the whole of the site is zoned as mixed use in the land use map. As a consequence the 20+% of the site that are public areas are not protected as recreational zones, which makes it possible to change controls later without having … Read more

The Paint Shop Precinct Proposed Floor Space Ratio (FSR) Map

The Paint Shop Precinct Proposed Floor Space Ratio (FSR) Map

This is an interesting map because it allocates 2.78 times the area across the entire site rather than to the proposed buildings. So the roads, walkways and public spaces all have the allocated FSR. The proposal uses a lower level planning document, the design guide, to say where that floor space should go rather than … Read more

Redfern North Eveleigh Paint Shop FAQs.

This is the Frequently asked Questions prepared by TfNSW prior to the exhibition which try’s to pre-empt the questions people might ask. For example it asks Q: Will there be a second bridge from North to South Eveleigh? A: While not part of the scope for the rezoning proposal, this has been considered when developing … Read more

Outline of the Paint Shop Precinct Masterplan

Outline of the Paint Shop Precinct Masterplan

This outline can be found in the Transport for NSW newsletter. It gives an overview of what is being proposed for the site under the masterplan reflected in the rezoning planning proposal on exhibition until 25 August 2022.

Redfern North Eveleigh – State Significant Precinct (SSP) Study Requirements

Rezoning in Redfern North Eveleigh will be done as a State Significant Precinct and on 21 December 2020 the Department of Planning Infrastructure and Environment (DPIE) issued the details of what Transport for NSW (TfNSW) must cover in its precinct studies for that rezoning. Study requirements have been prepared in consultation with state agencies and … Read more