Redfern Station Revised Concept Design Report Section D Appendices 2009

This is Part D Appendices of the Redfern Station Revised Concept Design report undertaken by Cox ARUP & Bovis Lend Lease. This part of the report is a scan of the following Appendices: 1 Architecture and Urban design peer review study; 2 Accessibility peer review study; 3 Crowd modelling peer review studies; 4 Engineering peer … Read more

Redfern Station Revised Concept Design Report Section C Cost and Constructability 2009

This is Part C Cost and Constructability of the Redfern Station Revised Concept Design report Section B Engineering Reports undertaken by Bovis Lend Lease. This part of the report is a scan of the Bovis Lend Lease report and deals with Construction Methodology and Program, Station upgrade and development costs and associated Appendices. Financial figures … Read more

Redfern Station Upgrade Concept Design Study Part B – Engineering Reports 2007

This is Part B of the Concept Design Study for the Redfern Station Upgrade of April 2007 undertaken by Connell Wagner. It deals with 1. Preliminary Service Recommendations 2. Requirements for vertical circulation under peak AM loads 3. Pedestrian Evacuation and Fire engineering report 4. STEPS Pedestrian Simulation Modelling results 5. Structural Design Report 6. … Read more

Redfern Station Upgrade – 2007 Proposed OptionsJackson Teece

In 2007 Jackson Teece produced a Concept Design Study for the Redfern Station Upgrade in 2007. They recommended three Options for the redevelopment: a “Base Case” (Option D) that addressed easy access, fire and other compliance issues on basically the same footprint ($29.5m); a “Base Case Plus” (Option E) that included additional works with Lawson … Read more

Redfern Station Upgrade – 2007 Study of preferred options

In 2007 Jackson Teece produced a Concept Design Study for the Redfern Station Upgrade. Appendix 4 of that report reported and assessed a number of previous proposals to upgrade Redfern Station as well as some additional suggestions from Jackson Teece. Jacson Teece’s Option C emerged from this study as the preferred option. It was later … Read more

Redfern Station Upgrade – Gateway Review Planning Session 10 May 2010

This document was the most recent of documents released in October 2013 by Transport NSW to a GIPA request initiated by Lift Redfern regarding planning for the Upgrade of Redfern Railway Station. This documents gives a quick overview of the issues needing to be adressed in upgrading Redfern Station and the key options considered. This … Read more

Airds Bradbury Baseline Study

The baseline study for Redfern Waterloo was based on the Baseline study for Airds Bradbury. REDWatch requested the Airds study be made available so the community could see how the Redfern Waterloo baseline study compared to what was found at Airs Bradbury. One of the difference was that satisfaction level with tenant’s dealing with Housing … Read more