Redfern Station Revised Concept Design Report Section D Appendices 2009This is Part D Appendices of the Redfern Station Revised Concept Design report undertaken by Cox ARUP & Bovis Lend Lease. This part of the report is a scan of the following Appendices: 1 Architecture and Urban design peer review study; 2 Accessibility peer review study; 3 Crowd modelling peer review studies; 4 Engineering peer review study; 5 Value engineering report; 6 Crowd modelling revised concept design report. This is part B of Document 27 of a GIPA release initiated by Lift Redfern (the documents can be obtained directly from Transport for NSW quoting Disclosure Log reference 1314-02). Financial Information has been withheld from parts of this document. File is 50MB PDF. https://dev.redwatch.org.au/RWA/statesignificant/station/studies/1310gipa/090723cabd/viewhttps://dev.redwatch.org.au/@@site-logo/logo.gif
Redfern Station Revised Concept Design Report Section D Appendices 2009
This is Part D Appendices of the Redfern Station Revised Concept Design report undertaken by Cox ARUP & Bovis Lend Lease. This part of the report is a scan of the following Appendices: 1 Architecture and Urban design peer review study; 2 Accessibility peer review study; 3 Crowd modelling peer review studies; 4 Engineering peer review study; 5 Value engineering report; 6 Crowd modelling revised concept design report. This is part B of Document 27 of a GIPA release initiated by Lift Redfern (the documents can be obtained directly from Transport for NSW quoting Disclosure Log reference 1314-02). Financial Information has been withheld from parts of this document. File is 50MB PDF.